Solar Oasis designs, supplies and installs solar for factories, warehouses, offices and farms in all seven emirates. Send us your bills: satellite assessment, no site visit for the first quote.
* With net metering in Dubai. Elsewhere it depends on daytime use, connected load and storage.
Dubai: Shams Dubai net metering
Outside Dubai: zero-export, hybrid or off-grid
Designed to your utility's rules
Smart inverters and app monitoring included
Tier-1 components such as Huawei inverters and Tier-1 panels
Systems can be expanded later
App monitoring from day one
Dubai: Shams Dubai net meteringOutside Dubai: zero-export, hybrid or off-gridDesigned to your utility's rulesSmart inverters and app monitoring includedTier-1 components such as Huawei inverters and Tier-1 panelsSystems can be expanded laterApp monitoring from day one
Dubai: Shams Dubai net meteringOutside Dubai: zero-export, hybrid or off-gridDesigned to your utility's rulesSmart inverters and app monitoring includedTier-1 components such as Huawei inverters and Tier-1 panelsSystems can be expanded laterApp monitoring from day one
Dubai: Shams Dubai net meteringOutside Dubai: zero-export, hybrid or off-gridDesigned to your utility's rulesSmart inverters and app monitoring includedTier-1 components such as Huawei inverters and Tier-1 panelsSystems can be expanded laterApp monitoring from day one
Dubai: Shams Dubai net meteringOutside Dubai: zero-export, hybrid or off-gridDesigned to your utility's rulesSmart inverters and app monitoring includedTier-1 components such as Huawei inverters and Tier-1 panelsSystems can be expanded laterApp monitoring from day one
Where your solar power goes.
Pick your emirate and your system, and watch the power move.
Your emirate
In Dubai, your system is connected under DEWA's Shams Dubai net metering: surplus solar is exported and credited on your future bills. Panels run your business first; what you don't use goes to the grid and comes back as credit.
Solar panels → Inverter → Your business. Surplus → Two-way meter → Grid (export); Grid → Two-way meter → Your business when needed. In the evening: Grid → Two-way meter → Your business.
1
Solar panels
2
Inverter
3
Your business
4
Two-way meter
5
Grid
1Solar panels
2Inverter
3Your business
4Two-way meter
5Grid
See your own number.From one bill.
Move the bill to yours. The result is your own estimate; the price on your survey-confirmed proposal is the price you pay.
Property
Monthly electricity
AED
On your bill: the electricity charge only, with VAT, not water, sewerage or housing fees. Average summer and winter.
Saved / month, incl. VAT
AED 24,98924,9890
System size
4314310 kWp
Off your electricity charge
90% or more
Set your own bill, emirate and property to see an indicative price and payback.
How we calculate+
Estimate only: the final price can be lower or higher depending on your site. Your fixed price comes in your proposal, after your site survey. The price on your proposal is the price you pay*: utility approvals included. Municipality fees and community NOCs are paid by the owner. *After your site survey.
From your electricity charge (VAT and the meter charge taken off), we value every displaced unit at your slab rate plus fuel surcharge, and count 3% yearly tariff rises against panel ageing, as our proposals do. The saving is shown with VAT, as on your bill; businesses that recover VAT save the ex-VAT amount, and payback uses that ex-VAT figure.
Indicative, for a typical system. Assumes about 1,620–1,711 kWh per kWp a year for homes (tilted panels) and 1,517–1,602 for businesses, depending on emirate, published utility tariffs (as of September 2026) rising 3% a year, panel output falling 1% in year 1 and 0.4% a year after, and the electricity charge or kWh you enter (not water, sewerage or housing fees). Savings are a share of the electricity charge, shown with VAT as on your bill. Prices excl. VAT. Utility approvals included; municipality fees and NOCs excluded. Your survey-based proposal is fixed.
Solarize your business · Smart solar, built for the UAE · Solarize your business · Smart solar, built for the UAE ·
Harness the Sun, Power your Future · Sunshine made simple · Find out what you're missing ·
Solarize your business · Smart solar, built for the UAEHarness the Sun, Power your Future · Sunshine made simple · Find out what you're missing
The same business bill, seven emirates.
Utilities price power differently, so the same electricity charge buys a different system and takes a different share off it. Pick a monthly electricity charge.
Monthly electricity charge:Average summer and winterSystem:Outside Dubai
DubaiDEWA
Yes: Shams Dubai net metering
System (kWp)
4314310 kWp
Saved / month (AED, incl. VAT)
AED 24,98924,9890
Off your electricity bill (%)
90% or more
Abu DhabiTAQA Distribution
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
6556550 kWp
Saved / month (AED, incl. VAT)
AED 17,48917,4890
Off your electricity bill (%)
70%† (see the rate note under the table)
SharjahSEWA
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
3073070 kWp
Saved / month (AED, incl. VAT)
AED 17,93017,9300
Off your electricity bill (%)
72%
AjmanEtihadWE
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
2982980 kWp* (see the connected-load note under the table)
Saved / month (AED, incl. VAT)
AED 17,95617,9560
Off your electricity bill (%)
72%
Umm Al QuwainEtihadWE
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
2982980 kWp* (see the connected-load note under the table)
Saved / month (AED, incl. VAT)
AED 17,95617,9560
Off your electricity bill (%)
72%
Ras Al KhaimahEtihadWE
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
2982980 kWp* (see the connected-load note under the table)
Saved / month (AED, incl. VAT)
AED 17,95617,9560
Off your electricity bill (%)
72%
FujairahEtihadWE
Zero-export, with hybrid (battery) and off-grid options
System (kWp)
2982980 kWp* (see the connected-load note under the table)
Saved / month (AED, incl. VAT)
AED 17,95617,9560
Off your electricity bill (%)
72%
Emirate
Utility
Net metering
System (kWp)
Saved / month (AED, incl. VAT)
Off your electricity bill (%)
Dubai
DEWA
Yes: Shams Dubai net metering
4314310 kWp
AED 24,98924,9890
90% or more
Abu Dhabi
TAQA Distribution
Zero-export, with hybrid (battery) and off-grid options
6556550 kWp
AED 17,48917,4890
70%† (see the rate note under the table)
Sharjah
SEWA
Zero-export, with hybrid (battery) and off-grid options
3073070 kWp
AED 17,93017,9300
72%
Ajman
EtihadWE
Zero-export, with hybrid (battery) and off-grid options
2982980 kWp* (see the connected-load note under the table)
AED 17,95617,9560
72%
Umm Al Quwain
EtihadWE
Zero-export, with hybrid (battery) and off-grid options
2982980 kWp* (see the connected-load note under the table)
AED 17,95617,9560
72%
Ras Al Khaimah
EtihadWE
Zero-export, with hybrid (battery) and off-grid options
2982980 kWp* (see the connected-load note under the table)
AED 17,95617,9560
72%
Fujairah
EtihadWE
Zero-export, with hybrid (battery) and off-grid options
2982980 kWp* (see the connected-load note under the table)
AED 17,95617,9560
72%
* Subject to 10% of your connected load: enter it in the calculator.
† TAQA's business rate is lower, so the same bill buys more kWh and needs a bigger system.
Indicative, your own estimate. Commercial tariffs from each utility's published tables as of September 2026, rising 3% a year. Starting from your monthly electricity charge, not the whole bill. Saved is shown with VAT, as on your bill; businesses that recover VAT save the ex-VAT amount. Your survey-confirmed proposal is fixed.
What every business system includes.
Panels named in your proposal
The exact make and model before you sign.
Tier‑1 inverters and panels
Tier-1 components such as Huawei inverters and Tier-1 panels.
Cabling & protection
DC and AC cabling, isolators and breakers, sized to your system and your utility's requirements.
Mounting built for UAE roofs
Rails and ballast rated for heat, salt air and shamal winds.
App monitoring included
Your team can see what the system generates, in the app.
Designed to each utility's rules
Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE.
Commissioned and handed over
Tested, switched on and explained to your team.
Warranties registered
We register the products and handle manufacturer claims for you.
Satellite assessment, no site visit for the first quote.
02
02. Site survey
We check the roof and confirm the design.
03
03. Design & proposal
We aim to send your proposal within a week.
04
04. Designed to each utility's rules
Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE.
05
05. Installation
Installation typically takes 2–4 weeks once we start on site.*
06
06. Power-on
Tested, switched on and explained to your team. Smart inverters and app monitoring included.
*Depends on the project size.
350 kW+350 kW+350 kW+0 kW+Installed.
Proof, on a warehouse roof.Al Jurf, Ajman.
Bu Faisal General Trading, 30 kWp · Al Jurf · Solar Oasis project, AjmanSOUQ Used Furniture Trading, 50 kWp · Al Jurf · Solar Oasis project, AjmanSOUQ Used Furniture Trading, 50 kWp · Al Jurf · Solar Oasis project, Ajman
Al Jurf, Ajman · warehouse rooftop
Commercial
11 daysfrom contract to power-on
system size
30 kWp
yearly bill
AED 18,560
bill reduction
≈60%
11 days from contract to power-on (Bu Faisal General Trading, Al Jurf, Ajman).
Bu Faisal General Trading
Case fact: Bu Faisal, Al Jurf, Ajman
In the client's words
“
From contract signing to commissioning, the system was operational in 11 days.
As a second-generation trading business operating in the UAE for over 20 years, energy cost control is critical to our warehouse operations. We had evaluated solar previously, but never moved forward due to concerns around reliability and execution. Solar Oasis addressed those concerns immediately. The commercial proposal was transparent, financially viable and clearly explained. More importantly, the execution matched the promise. From contract signing to commissioning, the system was operational in 11 days. The process was efficient, fully managed and caused zero disruption to our operations. Immediately, we began seeing savings. Based on this performance, we are already assessing expansion across additional facilities.
Yousuf KhanManaging Director, Bu Faisal General Trading
For larger businesses in Dubai, Sharjah and the Northern Emirates, payback is typically 3–4 years. It depends on your usage.*
*How this is worked out
Indicative, for a typical system. Assumes about 1,620–1,711 kWh per kWp a year for homes (tilted panels) and 1,517–1,602 for businesses, depending on emirate, published utility tariffs (as of September 2026) rising 3% a year, panel output falling 1% in year 1 and 0.4% a year after, and the electricity charge or kWh you enter (not water, sewerage or housing fees). Savings are a share of the electricity charge, shown with VAT as on your bill. Prices excl. VAT. Utility approvals included; municipality fees and NOCs excluded. Your survey-based proposal is fixed.
Business systems are priced per site, from 25 kWp to 1,000+ kWp. Send us your bills for a first, indicative quote; the price on your survey-confirmed proposal is the price you pay. The assumptions behind our figures are on our pricing page.
Yes. Solar Oasis serves all seven emirates. In Dubai, Shams Dubai net metering credits you for surplus power. Outside Dubai, systems are zero-export, with hybrid (battery) and off-grid options.
Yes. Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE. Solar Oasis stays your single point of accountability from survey to switch-on.
Installation typically takes 2–4 weeks once we start on site.**Depends on the project size.
Yes. Components are specified for UAE heat and dust, and the UAE gets strong sun all year.
Every month you wait is money you don't get back.
Send us your bills: satellite assessment, no site visit for the first quote. Or WhatsApp us your bill and a real person reads it.