From First Call to First Sunrise
Five steps, from your bill to switch-on.
- We start with a free assessment from your bill, then a site survey and design.
- Our team installs it, then handles inspection, switch-on and ongoing care.
- Installation typically takes 2–4 weeks once we start on site.*
*Depends on the project size.
- from first call to switch-on
- 5 steps
- decisions are all you make
- 2
- is all we need to start
- 1 bill
What do I actually have to do?Two decisions. The rest is on us.
You decide if the estimate is worth a visit, then you sign. Everything between your first message and switch-on is our work, in one WhatsApp thread.
- 01Tell us about your placeten minutes
- 02Survey and designopening the door
- 03Approvals, to your utility's ruleszero
- 04Installationzero
- 05Inspection, switch-on and ongoing carea fifteen-minute walkthrough
Gold is you. The rest of every bar is us. Two decisions and a WhatsApp thread: done right, that is what a solar project feels like.
The five steps
- 01
Day 0Your effort: ten minutes
Tell us about your place
Your first estimate, from one bill.
Send a recent electricity bill on WhatsApp or the form: that's genuinely all we need to start. From the bill and satellite imagery we build your first savings estimate: system size, production, bill impact, payback. If the numbers don't make sense for your property, we say so and part as friends.
Decision one: is the estimate worth a site visit?
- 02
Week 1Your effort: opening the door
Survey and design
One price, for your actual roof.
Our engineer visits: roof structure and space, shading through the day, electrical panel, cable routes. Then the real proposal: exact layout on your actual roof, panel and inverter selection from components on your utility's approved list, production modelling with realistic UAE soiling assumptions, one all-in price with utility approvals included, and your payback maths on your real tariff.
Decision two: sign. That's your last required action until handover.
- 03
Set by your utility and communityYour effort: zero
Approvals, to your utility's rules
Designed to your utility's current rules.
Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE. Where your community or landlord needs an NOC, your proposal says so. You get status updates in one thread.
- 04
2–4 weeks on site*Your effort: zero
Installation
Your system goes up, to the approved design.
Installation is carried out by our team. Installation typically takes 2–4 weeks once we start on site.* The installation crew installs mounting, panels, inverter, and cabling to the utility's standard, with Solar Oasis quality-checking against the approved design. Tidy site, sealed penetrations, labeled circuits. Commercial projects get a phased plan built around your operations.
*Depends on the project size.
- 05
Switch-on dayYour effort: a fifteen-minute walkthrough
Inspection, switch-on and ongoing care
Switched on, and looked after.
The utility inspects and swaps in the bidirectional meter where a net-metering programme applies. We commission the system, walk you through the monitoring app, live production on your phone, and hand over a plain-English owner's pack. Then we stay: maintenance plans, performance monitoring, and the same WhatsApp thread that answered your first question keeps answering your questions long after switch-on.