From First Call to First Sunrise

Six steps, from your bill to power-on.

  • We start with a free assessment from your bill, then a site survey and design.
  • Our team installs it, then handles inspection, switch-on and ongoing care.
  • Installation typically takes 2–4 weeks once we start on site.*

*Depends on the project size.

from first call to power-on
6 steps
decisions are all you make
2
is all we need to start
1 bill

What do I actually have to do?Two decisions. The rest is on us.

You decide if the estimate is worth a visit, then you sign. Everything between your first message and switch-on is our work, in one WhatsApp thread.

Your effort, step by step
  1. 01
    Share your billsten minutes
  2. 02
    Free site survey & energy checkopening the door
  3. 03
    Design & proposalreading the proposal
  4. 04
    Designed to each utility's ruleszero
  5. 05
    Installationzero
  6. 06
    Power-ona fifteen-minute walkthrough

Gold is you. The rest of every bar is us. Your part: two decisions and a WhatsApp thread.

The six steps

  1. 01

    Day 0Your effort: ten minutes

    Share your bills

    Your first estimate, from one bill.

    Send a recent electricity bill on WhatsApp or the form: that's all we need to start. From the bill and satellite imagery we build your first savings estimate: system size, production, bill impact, payback. If the numbers don't make sense for your property, we say so and part as friends.

    Decision one: is the estimate worth a site visit?

  2. Roof spaceShadePanel layout
    02

    Week 1Your effort: opening the door

    Free site survey & energy check

    Your roof and connection, checked at no cost.

    Our engineer visits at no cost and checks the roof structure and space, shading through the day, the electrical panel and cable routes.

  3. 03

    Aim: within a weekYour effort: reading the proposal

    Design & proposal

    One price, for your actual roof.

    We aim to send your proposal within a week. It gives the exact layout on your actual roof, panel and inverter selection from components on your utility's approved list, production modelling with realistic UAE soiling assumptions, one all-in price with utility approvals included, and your payback maths on your real tariff.

    Decision two: sign. That's your last required action until handover.

  4. 04

    Set by your utility and communityYour effort: zero

    Designed to each utility's rules

    Designed to your utility's current rules.

    Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE. Where your community or landlord needs an NOC, your proposal says so. You get status updates in one thread.

  5. 05

    Your effort: zero

    Installation

    Your system goes up, to the approved design.

    Installation is carried out by our team. Installation typically takes 2–4 weeks once we start on site.* Our crew fits the mounting, panels, inverter and cabling to the utility's standard, and Solar Oasis quality-checks it against the approved design. Tidy site, sealed penetrations, labelled circuits. Commercial projects get a phased plan built around your operations.

    *Depends on the project size.

  6. 06

    Switch-on dayYour effort: a fifteen-minute walkthrough

    Power-on

    Switched on, and looked after.

    The utility inspects and swaps in the bidirectional meter where a net-metering programme applies. We commission the system, walk you through the monitoring app, live production on your phone, and hand over a plain-English owner's pack. Then we stay: maintenance plans, performance monitoring, and the same WhatsApp thread that answered your first question keeps answering your questions long after switch-on.

FAQs

All 48 questions →

Answers by Mujtaba Ali, Co-Founder & Operations Director. Last reviewed .

Installation typically takes 2–4 weeks once we start on site.* Approval times vary by utility, and we give you the realistic timeline for your emirate before you sign. Commercial projects follow a phased plan agreed around your operations.*Depends on the project size.

Two things: approve the proposal and be reachable. The rest is our work, in one WhatsApp thread.

Slow community NOC cycles, utility inspection queues, and custom structural work (carports/pergolas). We flag any of these in the proposal, not after.

Yes. Owners abroad complete everything remotely except the owner's signature your utility requires, which can usually be arranged digitally or by authorised representative.

Against milestones defined in your proposal. The exact schedule is part of your quote.

Step one takes ten minutes and costs nothing.

350 kW+ installed · See our projects →
Step one is a photo of your bill. Our first estimate comes back on the same thread.