From First Call to First Sunrise

Five steps, from your bill to switch-on.

  • We start with a free assessment from your bill, then a site survey and design.
  • Our team installs it, then handles inspection, switch-on and ongoing care.
  • Installation typically takes 2–4 weeks once we start on site.*

*Depends on the project size.

from first call to switch-on
5 steps
decisions are all you make
2
is all we need to start
1 bill

What do I actually have to do?Two decisions. The rest is on us.

You decide if the estimate is worth a visit, then you sign. Everything between your first message and switch-on is our work, in one WhatsApp thread.

Your effort, step by step
  1. 01
    Tell us about your placeten minutes
  2. 02
    Survey and designopening the door
  3. 03
    Approvals, to your utility's ruleszero
  4. 04
    Installationzero
  5. 05
    Inspection, switch-on and ongoing carea fifteen-minute walkthrough

Gold is you. The rest of every bar is us. Two decisions and a WhatsApp thread: done right, that is what a solar project feels like.

The five steps

  1. 01

    Day 0Your effort: ten minutes

    Tell us about your place

    Your first estimate, from one bill.

    Send a recent electricity bill on WhatsApp or the form: that's genuinely all we need to start. From the bill and satellite imagery we build your first savings estimate: system size, production, bill impact, payback. If the numbers don't make sense for your property, we say so and part as friends.

    Decision one: is the estimate worth a site visit?

  2. 02

    Week 1Your effort: opening the door

    Survey and design

    One price, for your actual roof.

    Our engineer visits: roof structure and space, shading through the day, electrical panel, cable routes. Then the real proposal: exact layout on your actual roof, panel and inverter selection from components on your utility's approved list, production modelling with realistic UAE soiling assumptions, one all-in price with utility approvals included, and your payback maths on your real tariff.

    Decision two: sign. That's your last required action until handover.

  3. 03

    Set by your utility and communityYour effort: zero

    Approvals, to your utility's rules

    Designed to your utility's current rules.

    Every system is designed to your utility's current rules: DEWA, SEWA, TAQA or EtihadWE. Where your community or landlord needs an NOC, your proposal says so. You get status updates in one thread.

  4. 04

    2–4 weeks on site*Your effort: zero

    Installation

    Your system goes up, to the approved design.

    Installation is carried out by our team. Installation typically takes 2–4 weeks once we start on site.* The installation crew installs mounting, panels, inverter, and cabling to the utility's standard, with Solar Oasis quality-checking against the approved design. Tidy site, sealed penetrations, labeled circuits. Commercial projects get a phased plan built around your operations.

    *Depends on the project size.

  5. 05

    Switch-on dayYour effort: a fifteen-minute walkthrough

    Inspection, switch-on and ongoing care

    Switched on, and looked after.

    The utility inspects and swaps in the bidirectional meter where a net-metering programme applies. We commission the system, walk you through the monitoring app, live production on your phone, and hand over a plain-English owner's pack. Then we stay: maintenance plans, performance monitoring, and the same WhatsApp thread that answered your first question keeps answering your questions long after switch-on.

FAQs

All 47 questions →

Two things: approve the proposal and be reachable. The rest is our work, in one WhatsApp thread.

The honest list: slow community NOC cycles, utility inspection queues, and custom structural work (carports/pergolas). We flag any of these in the proposal, not after.

Yes. Owners abroad complete everything remotely except the owner's signature your utility requires, which can usually be arranged digitally or by authorized representative.

Against milestones defined in your proposal. The exact schedule is part of your quote.

Step one takes ten minutes and costs nothing.

Step one is a photo of your bill. Step two is our first estimate, back on the same thread.