As of 14 November 2026, SEWA publishes no customer rooftop-solar connection or net-metering programme. What that means in Sharjah.
By Basheer Ansari, Co-Founder & Managing Director
4 min readLast reviewed
The short answer
As of 14 November 2026, SEWA publishes no customer rooftop-solar connection or net-metering programme on its website or e-services. Confirm current options with SEWA on 600 566 665. In Sharjah, the systems we offer are zero-export, with hybrid (battery) and off-grid options.
- fils per kWh on the SEWA ladder
- 23–38
On this page7 sections
- fils per kWh on the SEWA ladder
- 23–38
Does SEWA publish a rooftop solar programme for customers?
As of 14 November 2026, SEWA publishes no customer rooftop-solar connection or net-metering programme on its website or e-services. We read the SEWA electricity pages and the e-services portal: neither lists a solar service. Confirm current options with SEWA on 600 566 665.
So systems in Sharjah are zero-export. Hybrid (battery) and off-grid designs are also available: see battery storage.
- Zero-export
- A system that powers your site and sends nothing back to the grid. You size it to your daytime load.
What do people mistake for a SEWA customer programme?
Two projects come up in searches. Neither is a scheme a Sharjah home or business can apply to.
SEWA's Sana solar plant
Khaleej Times reported that SEWA opened the Sana plant on 25 June 2025. It has a 60 MW capacity. It is a utility-owned plant. A customer does not connect a roof to it.
Sharjah Sustainable City
The National reported in 2022 that the community's developer called its system the first net-metering system in Sharjah, with credit passed to owners. It is developer-led and applies to that community. It is not open to other customers.
Sana plant
- Who runs it
- SEWA
- Type
- Utility solar plant
- Open to other customers
- No
- Source
- Khaleej Times, 2025
Suits: A utility project, not a customer route
Sustainable City
- Who runs it
- The developer
- Type
- Community net metering
- Open to other customers
- No
- Source
- The National, 2022
Suits: A community arrangement, not a customer route
What does SEWA charge for electricity?
SEWA bills Sharjah homes, shops, factories and farms on one ladder, as shown by its energy calculator. Our tariff data was last checked in September 2026.
Up to 2,000
- Rate (fils per kWh)
- 23
2,001 to 4,000
- Rate (fils per kWh)
- 28
4,001 to 6,000
- Rate (fils per kWh)
- 32
Above 6,000
- Rate (fils per kWh)
- 38
Zero-export solar cuts the units you buy in the daytime. We read your bills first.
- Fuel surcharge
- A per-kWh amount added to every slab. For SEWA it is 6 fils in our tariff data.
How does Sharjah compare with Dubai?
Sharjah
- Utility
- SEWA
- Customer solar programme published
- None, as of 14 Nov 2026
- System type we offer
- Zero-export, hybrid (battery) or off-grid
- Batteries
- Hybrid (battery) and off-grid available
Suits: Zero-export sized to your daytime load
Dubai
- Utility
- DEWA
- Customer solar programme published
- Shams Dubai
- System type we offer
- Net metering, or off-grid for any site
- Batteries
- A grid-connected system needs no battery; off-grid is offered for any site
Suits: Net metering under Shams Dubai
The price on your proposal is the price you pay*: utility approvals included. Municipality fees and community NOCs are paid by the owner. *After your site survey.
What should I do before buying solar in Sharjah?
- Call SEWA on 600 566 665 and ask about current options
- Gather 12 months of SEWA bills
- Ask your community or municipality what it needs
- Treat any claim of a SEWA scheme with caps and dates as unverified until it cites a SEWA document
Every emirate side by side: rooftop solar rules in each emirate.
Sources
- SEWA electricity, checked 14 Nov 2026
- SEWA e-services, checked 14 Nov 2026: user types and quick services, contact number
- SEWA energy calculator, checked 14 Nov 2026
- Khaleej Times, Sana solar plant, checked 14 Nov 2026
- The National, Sharjah Sustainable City, 11 Jun 2022, checked 14 Nov 2026
- WAM, Khor Fakkan, checked 14 Nov 2026
- WAM, Kalba Industrial City, checked 14 Nov 2026
Sharjah and SEWA FAQs
All 48 questions →Your number, from one bill.
Keep reading
- What Are the Rules for Rooftop Solar in Abu Dhabi?What DoE's rooftop solar policy allows in Abu Dhabi as of 14 November 2026: who it covers, self-consumption only, licences, TAQA Distribution and tariffs.
ExplainerApprovals and rules
8 min readReviewed
- How Does EtihadWE's Rooftop Solar Scheme (DSS) Work?EtihadWE's Distributed Solar Systems rules for Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah: who can join, size limits, billing, steps and status today.

Step by stepApprovals and rules
11 min readReviewed
- How Does Shams Dubai Approval Work, Step by Step?DEWA's Shams Dubai process in 3 stages and 6 steps: size limit, review times, export credits, yearly inspection and the connection cap, in plain English.

Step by stepApprovals and rules
13 min readReviewed